Engineer framing inspection

Framing may be complete, but a site inspection is necessary by the project engineer prior to the City building inspector approving the framing.  Minor issues are generally identified and resolved at this point so that the City inspector can be handed a stamped as built letter upon arrival.  In my experience handing the City a letter from the structural engineer can ease the process and possibly avoid unwanted delay.  There are three independent reviews of the framing before the insulation and drywall can be applied.  

There were some minor items highlighted on the structural pages found during the first inspection, already fixed and ready for the building inspector to visit. 