Roof install underway
/A break in the weather is allowing the roofers to get the building sealed up permanently. The roof has been delayed as each time we attempted to get the job started there was a large blizzard making work conditions unfeasible. We kept the roof shovelled and clear to avoid a lot of melting and leaking into the house during sunny days. It does not take a lot of sun to melt the snow and have it drip all over inside the building, making a large and annoying mess.